{"id":10592,"date":"2026-09-29T14:38:17","date_gmt":"2026-09-29T12:38:17","guid":{"rendered":"https:\/\/almelaw.com\/?p=10592"},"modified":"2026-09-29T14:50:25","modified_gmt":"2026-09-29T12:50:25","slug":"bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite","status":"publish","type":"post","link":"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/","title":{"rendered":"Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt"},"content":{"rendered":"<p><\/p>\n<h1>Sistemet BESS (me bateri) n\u00eb Maqedoni<\/h1>\n<p>Rritja e shpejt\u00eb e prodhimit t\u00eb energjis\u00eb elektrike nga dielli dhe era ka hapur nj\u00eb pyetje t\u00eb re p\u00ebr sistemin elektroenergjetik: <strong>si t\u00eb p\u00ebrdoret energjia e prodhuar at\u00ebher\u00eb kur \u00ebsht\u00eb m\u00eb e nevojshme, dhe jo vet\u00ebm at\u00ebher\u00eb kur kushtet atmosferike mund\u00ebsojn\u00eb prodhimin?<\/strong><\/p>\n<p>Pik\u00ebrisht k\u00ebtu sistemet BESS marrin nj\u00eb rol qendror.<\/p>\n<p>BESS (Battery Energy Storage System) \u00ebsht\u00eb nj\u00eb sistem me bateri p\u00ebr ruajtjen e energjis\u00eb elektrike, i cili mund\u00ebson q\u00eb energjia elektrike <strong>t\u00eb merret nga nj\u00eb central elektrik ose nga rrjeti, t\u00eb ruhet dhe m\u00eb pas t\u00eb dor\u00ebzohet s\u00ebrish kur kjo \u00ebsht\u00eb teknikisht ose ekonomikisht e arsyeshme<\/strong>.<\/p>\n<p>P\u00ebr investitor\u00ebt n\u00eb Maqedoni, BESS nuk \u00ebsht\u00eb m\u00eb vet\u00ebm nj\u00eb shtes\u00eb teknike e nj\u00eb centrali diellor ose me er\u00eb. <strong>Ligji i ri p\u00ebr Energjetik\u00eb e njeh ruajtjen e energjis\u00eb si veprimtari t\u00eb ve\u00e7ant\u00eb<\/strong>, parashikon disa modele t\u00eb projekteve BESS dhe, p\u00ebr centrale t\u00eb caktuara q\u00eb p\u00ebrdorin burime t\u00eb ndryshueshme t\u00eb energjis\u00eb s\u00eb rinovueshme, vendos edhe detyrimin p\u00ebr instalimin e nj\u00eb sistemi t\u00eb ruajtjes.<\/p>\n<p>Edhe interesi i tregut \u00ebsht\u00eb i konsideruesh\u00ebm. Plani Vjetor p\u00ebr Nd\u00ebrtimin e Objekteve Energjetike p\u00ebr vitin 2026 p\u00ebrfshin 96 sisteme t\u00eb ruajtjes, prej t\u00eb cilave 77 jan\u00eb t\u00eb integruara n\u00eb centrale ekzistuese ose t\u00eb reja dhe 19 jan\u00eb sisteme t\u00eb pavarura. Fuqia totale e planifikuar e tyre \u00ebsht\u00eb rreth 2.027 MW, me kapacitet ruajtjeje prej rreth 4.961 MWh dhe me vler\u00eb t\u00eb parashikuar investimi prej af\u00ebrsisht 1,98 miliard\u00eb euro. K\u00ebto shifra u referohen projekteve t\u00eb p\u00ebrfshira n\u00eb Plan dhe nuk n\u00ebnkuptojn\u00eb se t\u00eb gjitha jan\u00eb tashm\u00eb t\u00eb nd\u00ebrtuara ose se domosdoshm\u00ebrisht do t\u00eb realizohen.<\/p>\n<h2>\u00c7far\u00eb \u00ebsht\u00eb BESS dhe pse \u00ebsht\u00eb i r\u00ebnd\u00ebsish\u00ebm?<\/h2>\n<p>Te projektet BESS duhet t\u00eb dallohen dy parametra themelor\u00eb:<\/p>\n<p><strong>MW (megawatt)<\/strong> tregon fuqin\u00eb \u2013 p\u00ebrkat\u00ebsisht sa energji elektrike sistemi mund t\u00eb marr\u00eb ose t\u00eb dor\u00ebzoj\u00eb n\u00eb nj\u00eb moment t\u00eb caktuar.<\/p>\n<p><strong>MWh (megawatt-hour)<\/strong> tregon kapacitetin \u2013 p\u00ebrkat\u00ebsisht sa energji elektrike mund t\u00eb ruaj\u00eb sistemi.<\/p>\n<p>P\u00ebr shembull, nj\u00eb BESS me fuqi prej 10 MW dhe kapacitet prej 20 MWh, n\u00eb nj\u00eb shembull t\u00eb thjeshtuar, mund t\u00eb funksionoj\u00eb af\u00ebrsisht dy or\u00eb me fuqi maksimale prej 10 MW.<\/p>\n<p>Ky dallim \u00ebsht\u00eb thelb\u00ebsor si nga aspekti juridik, ashtu edhe nga ai komercial. <strong>Raporti MW\/MWh ndikon n\u00eb kushtet teknike, ky\u00e7jen n\u00eb rrjet, kontratat me prodhuesin e baterive, garancit\u00eb e performanc\u00ebs dhe burimet potenciale t\u00eb t\u00eb ardhurave.<\/strong><\/p>\n<p>BESS mund t\u00eb p\u00ebrdoret p\u00ebr disa q\u00ebllime: ruajtjen e energjis\u00eb s\u00eb prodhuar nga nj\u00eb central diellor ose me er\u00eb, optimizimin e koh\u00ebs s\u00eb shitjes s\u00eb energjis\u00eb elektrike, ofrimin e sh\u00ebrbimeve sistemore dhe balancuese, zvog\u00eblimin e kufizimeve t\u00eb prodhimit, si dhe menaxhimin e konsumit te p\u00ebrdoruesit industrial\u00eb.<\/p>\n<p>Por secili prej k\u00ebtyre modeleve ka struktur\u00eb t\u00eb ndryshme juridike dhe kontraktuale.<\/p>\n<h2>Cila \u00ebsht\u00eb korniza juridike p\u00ebr BESS n\u00eb Maqedonin\u00eb e Veriut?<\/h2>\n<p>Akti kryesor \u00ebsht\u00eb <strong>Ligji p\u00ebr Energjetik\u00eb<\/strong>, i publikuar n\u00eb \u201cGazet\u00ebn Zyrtare t\u00eb RMV-s\u00eb\u201d nr. 101\/2025, i cili zbatohet nga 29 maji 2025. Ligji \u00ebsht\u00eb ndryshuar gjat\u00eb vitit 2025 dhe p\u00ebrs\u00ebri n\u00eb korrik 2026, me ndryshimet e publikuara n\u00eb \u201cGazet\u00ebn Zyrtare t\u00eb RMV-s\u00eb\u201d nr. 172\/2026.<\/p>\n<p>Nga korriku 2026 ekziston edhe nj\u00eb <strong>Ligj i ve\u00e7ant\u00eb p\u00ebr Shfryt\u00ebzimin e Energjis\u00eb nga Burimet e Rinovueshme<\/strong>, si <em>lex specialis<\/em> p\u00ebr nj\u00eb s\u00ebr\u00eb \u00e7\u00ebshtjesh q\u00eb lidhen me energjin\u00eb e rinovueshme. Megjithat\u00eb, regjimi juridik baz\u00eb p\u00ebr ruajtjen e energjis\u00eb elektrike vazhdon t\u00eb rregullohet me Ligjin p\u00ebr Energjetik\u00eb.<\/p>\n<p>N\u00eb var\u00ebsi t\u00eb projektit konkret, paralelisht mund t\u00eb jen\u00eb relevante edhe rregullat p\u00ebr nd\u00ebrtimin dhe planifikimin hap\u00ebsinor, ky\u00e7jen n\u00eb sistemin elektroenergjetik, licencimin, mbrojtjen e mjedisit jet\u00ebsor, mbrojtjen nga zjarri, si dhe dispozitat p\u00ebr baterit\u00eb, akumulator\u00ebt dhe menaxhimin e mbetjeve.<\/p>\n<p><strong>Prandaj, nj\u00eb projekt BESS nuk duhet t\u00eb analizohet vet\u00ebm si \u201cblerje e bateris\u00eb\u201d.<\/strong> Struktura juridike fillon shum\u00eb m\u00eb her\u00ebt \u2013 me zgjedhjen e modelit t\u00eb projektit, lokacionit dhe m\u00ebnyr\u00ebs s\u00eb ky\u00e7jes n\u00eb rrjet.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10598\" src=\"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_2.jpg\" alt=\"\" width=\"836\" height=\"386\" srcset=\"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_2.jpg 836w, https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_2-300x139.jpg 300w, https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_2-768x355.jpg 768w, https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_2-600x277.jpg 600w\" sizes=\"auto, (max-width: 836px) 100vw, 836px\" \/><\/p>\n<h3>Kat\u00ebr modele t\u00eb ruajtjes sipas Ligjit p\u00ebr Energjetik\u00eb<\/h3>\n<p>Neni 130 i Ligjit p\u00ebr Energjetik\u00eb b\u00ebn nj\u00eb dallim t\u00eb r\u00ebnd\u00ebsish\u00ebm nd\u00ebrmjet m\u00ebnyrave t\u00eb ndryshme n\u00eb t\u00eb cilat mund t\u00eb kryhet ruajtja e energjis\u00eb elektrike.<\/p>\n<p>Ligji parashikon:<\/p>\n<ol start=\"1\">\n<li><strong>sistem t\u00eb pavarur t\u00eb ruajtjes<\/strong>, i menaxhuar nga nj\u00eb operator i ruajtjes dhe q\u00eb nuk \u00ebsht\u00eb pjes\u00eb e centralit elektrik t\u00eb nj\u00eb prodhuesi ose e nj\u00eb konsumatori;<\/li>\n<li><strong>sistem ruajtjeje si pjes\u00eb p\u00ebrb\u00ebr\u00ebse e nj\u00eb centrali elektrik me fuqi t\u00eb instaluar prej s\u00eb paku 1 MW<\/strong>, p\u00ebr t\u00eb cilin \u00ebsht\u00eb relevant regjimi i autorizimit p\u00ebr nd\u00ebrtim;<\/li>\n<li><strong>sistem ruajtjeje si pjes\u00eb p\u00ebrb\u00ebr\u00ebse e nj\u00eb centrali elektrik me fuqi n\u00ebn 1 MW<\/strong>, p\u00ebr t\u00eb cilin Ligji nuk k\u00ebrkon autorizim t\u00eb ve\u00e7ant\u00eb p\u00ebr nd\u00ebrtimin e sistemit t\u00eb ruajtjes, p\u00ebrkat\u00ebsisht t\u00eb centralit elektrik; dhe<\/li>\n<li><strong>sistem ruajtjeje si komponent plot\u00ebsisht i integruar i rrjetit<\/strong> t\u00eb sistemit t\u00eb transmetimit ose shp\u00ebrndarjes, n\u00ebn kushte t\u00eb ve\u00e7anta ligjore.<\/li>\n<\/ol>\n<p>Kjo ndarje \u00ebsht\u00eb e r\u00ebnd\u00ebsishme sepse <strong>nj\u00eb projekt standalone BESS dhe nj\u00eb BESS i integruar n\u00eb nj\u00eb central fotovoltaik nuk kalojn\u00eb domosdoshm\u00ebrisht n\u00ebp\u00ebr t\u00eb nj\u00ebjt\u00ebn procedur\u00eb rregullatore dhe t\u00eb licencimit<\/strong>.<\/p>\n<p>Ligji p\u00ebrcakton gjithashtu se nj\u00eb sistem ruajtjeje q\u00eb \u00ebsht\u00eb pjes\u00eb p\u00ebrb\u00ebr\u00ebse e nj\u00eb centrali elektrik dhe ka fuqi t\u00eb instaluar deri n\u00eb 40% t\u00eb fuqis\u00eb s\u00eb instaluar t\u00eb centralit elektrik konsiderohet sistem i integruar i ruajtjes. Nj\u00eb sistem i till\u00eb mund t\u00eb ruaj\u00eb energjin\u00eb elektrike t\u00eb prodhuar nga nj\u00ebsit\u00eb e veta gjeneruese, por edhe energji elektrike t\u00eb marr\u00eb nga rrjeti dhe m\u00eb pas ta dor\u00ebzoj\u00eb at\u00eb s\u00ebrish n\u00eb rrjet, brenda fuqis\u00eb maksimale t\u00eb nj\u00ebkohshme t\u00eb miratuar t\u00eb ky\u00e7jes.<\/p>\n<p>Kjo \u00ebsht\u00eb ve\u00e7an\u00ebrisht e r\u00ebnd\u00ebsishme p\u00ebr modelin afarist t\u00eb projektit: nj\u00eb BESS i integruar nuk duhet domosdoshm\u00ebrisht t\u00eb kufizohet vet\u00ebm n\u00eb \u201cruajtjen\u201d e prodhimit t\u00eb vet diellor.<\/p>\n<h3>A \u00ebsht\u00eb BESS i detyruesh\u00ebm p\u00ebr centralet diellore dhe ato me er\u00eb?<\/h3>\n<p>Kjo \u00ebsht\u00eb nj\u00eb nga \u00e7\u00ebshtjet m\u00eb t\u00eb r\u00ebnd\u00ebsishme n\u00eb korniz\u00ebn aktuale juridike.<\/p>\n<p>N\u00eb tekstin fillestar t\u00eb Ligjit p\u00ebr Energjetik\u00eb t\u00eb vitit 2025, neni 87 paragrafi 15 parashikonte q\u00eb centralet elektrike q\u00eb p\u00ebrdorin burim t\u00eb ndryshuesh\u00ebm t\u00eb energjis\u00eb s\u00eb rinovueshme duhet t\u00eb ken\u00eb sistem ruajtjeje me fuqi t\u00eb instaluar t\u00eb barabart\u00eb me 20% t\u00eb fuqis\u00eb s\u00eb instaluar t\u00eb centralit elektrik. E nj\u00ebjta dispozit\u00eb k\u00ebrkonte q\u00eb kapaciteti i ruajtjes t\u00eb mund\u00ebsonte cik\u00ebl ngarkimi dhe shkarkimi prej s\u00eb paku dy or\u00ebsh me fuqin\u00eb maksimale t\u00eb instaluar t\u00eb sistemit t\u00eb ruajtjes.<\/p>\n<p>Megjithat\u00eb, me ndryshimin e Ligjit t\u00eb miratuar n\u00eb korrik 2026, <strong>20% fikse u z\u00ebvend\u00ebsua me interval prej s\u00eb paku 20% deri n\u00eb m\u00eb s\u00eb shumti 40% t\u00eb fuqis\u00eb s\u00eb instaluar t\u00eb centralit elektrik<\/strong>. Ndryshimi nuk e eliminon kriterin ekzistues prej dy or\u00ebsh.<\/p>\n<p>N\u00eb praktik\u00eb, n\u00ebse si shembull t\u00eb thjeshtuar marrim nj\u00eb central fotovoltaik prej 10 MW, intervali ligjor i fuqis\u00eb s\u00eb BESS do t\u00eb ishte nga 2 MW deri n\u00eb 4 MW. N\u00eb nivelin minimal prej 2 MW, kushti prej s\u00eb paku dy or\u00ebsh do t\u00eb n\u00ebnkuptonte t\u00eb pakt\u00ebn 4 MWh kapacitet; nd\u00ebrsa te 4 MW, kjo do t\u00eb ishte 8 MWh.<\/p>\n<p>Megjithat\u00eb, dispozita e vitit 2026 duhet t\u00eb zbatohet me kujdes. Ajo p\u00ebrcakton nj\u00eb interval ligjor prej 20% deri n\u00eb 40%, por dimensionimi konkret i nj\u00eb projekti duhet t\u00eb verifikohet s\u00eb bashku me Planin Vjetor, analizat e rrjetit dhe t\u00eb tregut, kushtet e ky\u00e7jes dhe aktet q\u00eb lidhen me investimin konkret. Vet\u00eb ekzistenca e k\u00ebtij intervali nuk duhet t\u00eb interpretohet automatikisht si e drejt\u00eb e pakufizuar e investitorit q\u00eb n\u00eb m\u00ebnyr\u00eb t\u00eb nj\u00ebanshme t\u00eb zgjedh\u00eb cil\u00ebndo vler\u00eb brenda k\u00ebtij intervali.<\/p>\n<p>Ndryshimet e korrikut 2026 kan\u00eb vendosur edhe nj\u00eb p\u00ebrjashtim: ky detyrim nuk zbatohet p\u00ebr nj\u00eb central elektrik ose objekt prodhimi, nd\u00ebrtimi i t\u00eb cilit financohet nga Buxheti i Republik\u00ebs s\u00eb Maqedonis\u00eb s\u00eb Veriut ose nga nj\u00eb hua p\u00ebr t\u00eb cil\u00ebn shteti jep garanci.<\/p>\n<h3>Plani Vjetor b\u00ebhet pjes\u00eb e r\u00ebnd\u00ebsishme e zhvillimit t\u00eb projektit<\/h3>\n<p>Regjimi i ri energjetik e lidh zhvillimin e objekteve m\u00eb t\u00eb m\u00ebdha energjetike me Planin Vjetor p\u00ebr Nd\u00ebrtimin e Objekteve Energjetike.<\/p>\n<p>N\u00eb procesin e p\u00ebrgatitjes s\u00eb tij, Ministria, MEPSO dhe operatori i sistemit t\u00eb shp\u00ebrndarjes s\u00eb energjis\u00eb elektrike shqyrtojn\u00eb, nd\u00ebr t\u00eb tjera, mund\u00ebsit\u00eb p\u00ebr ky\u00e7je, nevoj\u00ebn p\u00ebr rezerva sistemore, investimet e nevojshme n\u00eb rrjet, si dhe analizat e rrjetit dhe t\u00eb tregut.<\/p>\n<p><strong>Pik\u00ebrisht p\u00ebr k\u00ebt\u00eb arsye, p\u00ebr investitorin nuk mjafton vet\u00ebm t\u00eb ket\u00eb tok\u00eb t\u00eb p\u00ebrshtatshme dhe ofert\u00eb teknike p\u00ebr baterit\u00eb. Kapaciteti i rrjetit dhe statusi i projektit n\u00eb procedurat p\u00ebrkat\u00ebse planifikuese dhe rregullatore mund t\u00eb jen\u00eb vendimtare p\u00ebr realizimin e tij.<\/strong><\/p>\n<p>Plani Vjetor p\u00ebr vitin 2026 e ilustron mir\u00eb shkall\u00ebn e interesit: p\u00ebrve\u00e7 77 sistemeve t\u00eb integruara t\u00eb ruajtjes, ai p\u00ebrfshin edhe 19 sisteme standalone me fuqi t\u00eb p\u00ebrgjithshme prej 637,518 MW dhe kapacitet prej 1.494,746 MWh.<\/p>\n<h2>Si duket rruga rregullatore e nj\u00eb projekti BESS?<\/h2>\n<p>Nuk ekziston nj\u00eb list\u00eb e vetme universale e lejeve q\u00eb zbatohet p\u00ebr \u00e7do projekt BESS.<\/p>\n<p>Procedura varet, nd\u00ebr t\u00eb tjera, nga:<\/p>\n<ul>\n<li>n\u00ebse BESS \u00ebsht\u00eb standalone apo i integruar n\u00eb nj\u00eb central elektrik;<\/li>\n<li>fuqia e instaluar;<\/li>\n<li>n\u00ebse nd\u00ebrtohet nj\u00eb objekt i ri apo BESS i shtohet nj\u00eb centrali ekzistues;<\/li>\n<li>pron\u00ebsia dhe statusi i tok\u00ebs;<\/li>\n<li>m\u00ebnyra dhe niveli i tensionit t\u00eb ky\u00e7jes;<\/li>\n<li>n\u00ebse projekti k\u00ebrkon leje nd\u00ebrtimi ose mund t\u00eb realizohet n\u00eb baz\u00eb t\u00eb nj\u00eb akti tjet\u00ebr t\u00eb parashikuar nga rregullat e nd\u00ebrtimit;<\/li>\n<li>n\u00ebse nevojitet autorizim nga Ministria;<\/li>\n<li>dhe \u00e7far\u00eb statusi t\u00eb licencimit dhe t\u00eb tregut do t\u00eb ket\u00eb operatori.<\/li>\n<\/ul>\n<p>N\u00eb aspekt praktik, zhvillimi zakonisht duhet t\u2019i koordinoj\u00eb proceset e m\u00ebposhtme:<\/p>\n<p><strong>struktura e projektit dhe struktura korporative \u2192 toka dhe dokumentacioni planifikues \u2192 statusi sipas Planit Vjetor \u2192 ky\u00e7ja \u2192 dokumentacioni nd\u00ebrtimor \u2192 autorizimi, kur k\u00ebrkohet \u2192 v\u00ebnia teknike n\u00eb p\u00ebrdorim \u2192 licencimi \u2192 kontratat e tregut dhe t\u00eb balancimit.<\/strong><\/p>\n<p>Rendi nuk \u00ebsht\u00eb gjithmon\u00eb plot\u00ebsisht linear. Disa procedura mbivendosen, nd\u00ebrsa rezultati i nj\u00ebr\u00ebs \u2013 ve\u00e7an\u00ebrisht i procedur\u00ebs s\u00eb ky\u00e7jes \u2013 mund t\u00eb ndikoj\u00eb n\u00eb struktur\u00ebn teknike dhe ekonomike t\u00eb t\u00eb tjerave.<\/p>\n<p>P\u00ebr nj\u00eb BESS q\u00eb i shtohet nj\u00eb centrali elektrik ekzistues, duhet t\u00eb kontrollohet shtes\u00eb n\u00ebse lejet ekzistuese, licenca, aktvendimi p\u00ebr ky\u00e7je dhe kontratat duhet t\u00eb ndryshohen.<\/p>\n<h3>Licenca: standalone BESS dhe BESS i integruar nuk jan\u00eb t\u00eb nj\u00ebjt\u00eb<\/h3>\n<p>Ruajtja e pavarur q\u00eb kryhet nga nj\u00eb operator i ruajtjes parashikohet si veprimtari energjetike n\u00eb Ligjin p\u00ebr Energjetik\u00eb. BESS i integruar, nga ana tjet\u00ebr, mund t\u00eb jet\u00eb pjes\u00eb e regjimit t\u00eb licencimit t\u00eb vet\u00eb centralit elektrik, n\u00eb var\u00ebsi t\u00eb struktur\u00ebs s\u00eb projektit.<\/p>\n<p>Praktika e Komisionit Rregullator tashm\u00eb tregon shembuj ku nj\u00eb licenc\u00eb ekzistuese p\u00ebr prodhimin e energjis\u00eb elektrike \u00ebsht\u00eb ndryshuar p\u00ebr shkak t\u00eb integrimit t\u00eb nj\u00eb sistemi t\u00eb ruajtjes n\u00eb centralin elektrik. Ky \u00ebsht\u00eb nj\u00eb tregues i mir\u00eb se \u00e7\u00ebshtja e licenc\u00ebs duhet t\u00eb analizohet q\u00eb n\u00eb faz\u00ebn e strukturimit dhe jo vet\u00ebm pasi t\u00eb jen\u00eb instaluar baterit\u00eb.<\/p>\n<p>P\u00ebr \u00e7do projekt duhet t\u00eb p\u00ebrcaktohen ve\u00e7mas veprimtaria p\u00ebrkat\u00ebse energjetike, autorizimet e nevojshme dhe p\u00ebrmbajtja ose ndryshimi i licenc\u00ebs.<\/p>\n<h3>Ky\u00e7ja n\u00eb rrjet mund t\u00eb jet\u00eb m\u00eb e r\u00ebnd\u00ebsishme se vet\u00eb bateria<\/h3>\n<p>Nga perspektiva e investimit, nj\u00eb nga vlerat m\u00eb t\u00eb r\u00ebnd\u00ebsishme t\u00eb BESS \u00ebsht\u00eb aft\u00ebsia p\u00ebr t\u00eb marr\u00eb dhe p\u00ebr t\u00eb dor\u00ebzuar energji elektrike n\u00eb periudha t\u00eb ndryshme.<\/p>\n<p>Por BESS nuk krijon automatikisht nj\u00eb t\u00eb drejt\u00eb t\u00eb re p\u00ebr eksport t\u00eb pakufizuar t\u00eb energjis\u00eb n\u00eb rrjet.<\/p>\n<p>Ligji parashikon shprehimisht se sistemi i integruar mund t\u00eb marr\u00eb energji nga rrjeti dhe ta dor\u00ebzoj\u00eb at\u00eb s\u00ebrish n\u00eb p\u00ebrputhje me fuqin\u00eb maksimale t\u00eb nj\u00ebkohshme t\u00eb miratuar t\u00eb ky\u00e7jes. Te nj\u00eb central elektrik me BESS t\u00eb integruar, fuqia totale q\u00eb dor\u00ebzohet n\u00eb sistem gjithashtu nuk duhet ta tejkaloj\u00eb fuqin\u00eb maksimale t\u00eb p\u00ebrcaktuar n\u00eb aktvendimin p\u00ebr ky\u00e7je.<\/p>\n<p>Prandaj, para blerjes s\u00eb pajisjeve BESS duhet t\u00eb analizohen s\u00eb paku:<\/p>\n<ul>\n<li>ky\u00e7ja ekzistuese ose e planifikuar;<\/li>\n<li>fuqia maksimale e lejuar e importit\/eksportit;<\/li>\n<li>kufizimet e mundshme n\u00eb regjimet e operimit;<\/li>\n<li>matjet e nevojshme, telemetria dhe kontrolli n\u00eb distanc\u00eb;<\/li>\n<li>kushtet p\u00ebr pjes\u00ebmarrje n\u00eb treg dhe n\u00eb mekanizmin e balancimit.<\/li>\n<\/ul>\n<p><strong>Nj\u00eb BESS i dimensionuar gabimisht mund t\u00eb jet\u00eb teknikisht i shk\u00eblqyer, por ekonomikisht i kufizuar n\u00ebse t\u00eb drejtat q\u00eb burojn\u00eb nga ky\u00e7ja nuk lejojn\u00eb shfryt\u00ebzimin e tij t\u00eb plot\u00eb.<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10597\" src=\"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_1.jpg\" alt=\"\" width=\"836\" height=\"386\" srcset=\"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_1.jpg 836w, https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_1-300x139.jpg 300w, https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_1-768x355.jpg 768w, https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/alme_bess_blog_intext_1-600x277.jpg 600w\" sizes=\"auto, (max-width: 836px) 100vw, 836px\" \/><\/p>\n<h2>Nga mund t\u00eb vijn\u00eb t\u00eb ardhurat e BESS?<\/h2>\n<p>Ligji i mund\u00ebson operatorit t\u00eb ruajtjes t\u00eb marr\u00eb pjes\u00eb n\u00eb tregjet e energjis\u00eb elektrike, p\u00ebrkat\u00ebsisht t\u00eb blej\u00eb dhe shes\u00eb energji elektrike, t\u00eb ofroj\u00eb sh\u00ebrbime t\u00eb ruajtjes dhe t\u2019u ofroj\u00eb sh\u00ebrbime sistemore operator\u00ebve t\u00eb sistemit t\u00eb transmetimit dhe shp\u00ebrndarjes.<\/p>\n<p>N\u00ebse fuqia maksimale e nj\u00ebkohshme q\u00eb sistemi i ruajtjes mund ta dor\u00ebzoj\u00eb n\u00eb rrjet \u00ebsht\u00eb s\u00eb paku 1 MW, Ligji parashikon edhe mund\u00ebsin\u00eb e lidhjes s\u00eb nj\u00eb kontrate me operatorin e sistemit t\u00eb transmetimit p\u00ebr pjes\u00ebmarrje n\u00eb mekanizmin e balancimit.<\/p>\n<p>N\u00eb var\u00ebsi t\u00eb modelit teknik dhe t\u00eb tregut, burimet potenciale t\u00eb vler\u00ebs mund t\u00eb p\u00ebrfshijn\u00eb:<\/p>\n<ul>\n<li>blerjen dhe ruajtjen n\u00eb periudha me \u00e7mime m\u00eb t\u00eb ul\u00ebta dhe shitjen n\u00eb periudha t\u00eb tjera;<\/li>\n<li>optimizimin e shitjes s\u00eb energjis\u00eb nga nj\u00eb central fotovoltaik ose me er\u00eb;<\/li>\n<li>sh\u00ebrbime balancuese dhe sistemore;<\/li>\n<li>sh\u00ebrbime ruajtjeje p\u00ebr pjes\u00ebmarr\u00ebs t\u00eb tjer\u00eb n\u00eb treg;<\/li>\n<li>optimizimin e konsumit vetjak te p\u00ebrdoruesit industrial\u00eb.<\/li>\n<\/ul>\n<p>Megjithat\u00eb, ekzistenca e nj\u00eb t\u00eb drejte ligjore p\u00ebr pjes\u00ebmarrje n\u00eb nj\u00eb treg t\u00eb caktuar nuk do t\u00eb thot\u00eb se \u00e7do model \u00ebsht\u00eb automatikisht ekonomikisht ose bankarisht i q\u00ebndruesh\u00ebm. Duhet t\u00eb analizohen rregullat p\u00ebrkat\u00ebse t\u00eb tregut, struktura e \u00e7mimeve, degradimi dhe numri i cikleve t\u00eb baterive, kushtet e ky\u00e7jes dhe kontratat p\u00ebrmes t\u00eb cilave do t\u00eb realizohen t\u00eb ardhurat.<\/p>\n<h3>Cilat kontrata jan\u00eb kritike te nj\u00eb projekt BESS?<\/h3>\n<p>Te BESS, dokumentacioni kontraktual \u00ebsht\u00eb po aq i r\u00ebnd\u00ebsish\u00ebm sa edhe lejet administrative.<\/p>\n<p><strong>1. Kontrata BESS Supply \/ EPC<\/strong><\/p>\n<p>Kontrata duhet t\u00eb p\u00ebrcaktoj\u00eb sakt\u00ebsisht fuqin\u00eb e garantuar n\u00eb MW, kapacitetin e shfryt\u00ebzuesh\u00ebm n\u00eb MWh, efikasitetin, disponueshm\u00ebrin\u00eb e sistemit, numrin dhe thell\u00ebsin\u00eb e lejuar t\u00eb cikleve, degradimin dhe testet e pranimit.<\/p>\n<p>V\u00ebmendje e ve\u00e7ant\u00eb duhet t\u2019u kushtohet garancive p\u00ebr kapacitetin gjat\u00eb jet\u00ebgjat\u00ebsis\u00eb s\u00eb projektit. Nj\u00eb bateri q\u00eb p\u00ebrmbush 20 MWh n\u00eb dat\u00ebn e v\u00ebnies n\u00eb p\u00ebrdorim nuk do ta ruaj\u00eb domosdoshm\u00ebrisht t\u00eb nj\u00ebjtin kapacitet t\u00eb shfryt\u00ebzuesh\u00ebm pas disa vitesh.<\/p>\n<p>Prandaj, kontrata duhet t\u00eb p\u00ebrcaktoj\u00eb se kush e merr p\u00ebrsip\u00ebr rrezikun e degradimit dhe n\u00ebse prodhuesi ose kontraktuesi EPC ka detyrim p\u00ebr <em>augmentation<\/em>, z\u00ebvend\u00ebsim t\u00eb moduleve ose masa t\u00eb tjera korrigjuese.<\/p>\n<p><strong>2. O&amp;M dhe mir\u00ebmbajtja afatgjat\u00eb<\/strong><\/p>\n<p>Duhet t\u00eb rregullohen mir\u00ebmbajtja parandaluese dhe korrigjuese, pjes\u00ebt rezerv\u00eb, koha e reagimit, <em>remote monitoring<\/em>, qasja n\u00eb sistemet BMS\/EMS, p\u00ebrdit\u00ebsimet e softuerit dhe p\u00ebrgjegj\u00ebsia p\u00ebr defektet.<\/p>\n<p>Te nj\u00eb sistem, vlera komerciale e t\u00eb cilit varet nga disponueshm\u00ebria n\u00eb or\u00eb t\u00eb caktuara, nj\u00eb detyrim i thjesht\u00eb \u201cp\u00ebr ta riparuar defektin\u201d shpesh nuk \u00ebsht\u00eb i mjaftuesh\u00ebm.<\/p>\n<p><strong>3. Ky\u00e7ja dhe kontratat e tregut<\/strong><\/p>\n<p>Kontratat dhe aktet e ky\u00e7jes duhet t\u00eb jen\u00eb n\u00eb p\u00ebrputhje me <em>operating model<\/em> real t\u00eb BESS \u2013 duke p\u00ebrfshir\u00eb marrjen e energjis\u00eb nga rrjeti, dor\u00ebzimin n\u00eb rrjet, matjen dhe ofrimin eventual t\u00eb sh\u00ebrbimeve balancuese ose sistemore.<\/p>\n<p>N\u00ebse t\u00eb ardhurat varen nga nj\u00eb agregator, tregtar ose ofrues i sh\u00ebrbimeve t\u00eb balancimit, edhe k\u00ebto kontrata b\u00ebhen pjes\u00eb e analiz\u00ebs s\u00eb <em>bankability<\/em>.<\/p>\n<p><strong>4. Financimi<\/strong><\/p>\n<p>Te nj\u00eb projekt i financuar, banka ose financuesi tjet\u00ebr zakonisht do t\u00eb jet\u00eb i interesuar p\u00ebr transferueshm\u00ebrin\u00eb e kontratave kryesore, t\u00eb drejtat <em>step-in<\/em>, garancit\u00eb e prodhuesit, sigurimin, kufizimet e p\u00ebrgjegj\u00ebsis\u00eb dhe stabilitetin e t\u00eb ardhurave t\u00eb pritshme.<\/p>\n<p>Teknologjia BESS gjithashtu k\u00ebrkon nj\u00eb analiz\u00eb t\u00eb ndryshme t\u00eb <em>degradation risk<\/em>, <em>warranty risk<\/em> dhe <em>replacement cost<\/em> krahasuar me nj\u00eb central klasik diellor.<\/p>\n<h3><strong>Mbrojtja nga zjarri dhe rreziku teknik<\/strong><\/h3>\n<p>Siguria e BESS nuk duhet t\u00eb trajtohet vet\u00ebm si \u00e7\u00ebshtje teknike e prodhuesit.<\/p>\n<p>Te sistemet me bateri jan\u00eb relevante rreziqet q\u00eb lidhen me mbinxehjen, zjarrin, <em>thermal runaway<\/em>, sistemet e detektimit dhe shuarjes, distanc\u00ebn fizike nd\u00ebrmjet moduleve dhe qasjen p\u00ebr nd\u00ebrhyrje emergjente.<\/p>\n<p>Dokumentacioni rregullator maqedonas p\u00ebr autorizimin e objekteve t\u00eb ruajtjes parashikon edhe dokumentacion q\u00eb lidhet me mbrojtjen nga zjarri. Prandaj, ndarja e p\u00ebrgjegj\u00ebsis\u00eb p\u00ebr <em>fire design<\/em>, <em>compliance<\/em>, testimin dhe defektin eventual duhet t\u00eb rregullohet qart\u00eb edhe n\u00eb dokumentacionin EPC\/Supply.<\/p>\n<h2>Mjedisi jet\u00ebsor dhe \u00e7far\u00eb ndodh me baterin\u00eb n\u00eb fund t\u00eb jet\u00ebgjat\u00ebsis\u00eb s\u00eb saj?<\/h2>\n<p>Jo \u00e7do BESS i n\u00ebnshtrohet automatikisht t\u00eb nj\u00ebjt\u00ebs procedur\u00eb mjedisore. Nevoja p\u00ebr leje konkrete mjedisore duhet t\u00eb kontrollohet n\u00eb baz\u00eb t\u00eb lokacionit, madh\u00ebsis\u00eb, infrastruktur\u00ebs s\u00eb nd\u00ebrlidhur dhe konfigurimit t\u00eb p\u00ebrgjithsh\u00ebm t\u00eb projektit.<\/p>\n<p>P\u00ebr m\u00eb tep\u00ebr, n\u00eb Maqedonin\u00eb e Veriut \u00ebsht\u00eb n\u00eb fuqi Ligji p\u00ebr Menaxhimin me Baterit\u00eb dhe Akumulator\u00ebt dhe Baterit\u00eb dhe Akumulator\u00ebt e Mbetur. Te sistemet industriale t\u00eb baterive t\u00eb importuara duhet t\u00eb kontrollohet me koh\u00eb se cili subjekt ka status dhe detyrime sipas regjimit p\u00ebr vendosjen e baterive n\u00eb treg dhe menaxhimin e mbetjeve.<\/p>\n<p>Nga perspektiva e projektit, kjo do t\u00eb thot\u00eb se q\u00eb n\u00eb kontrat\u00ebn Supply\/EPC \u00ebsht\u00eb e dobishme t\u00eb rregullohen \u00e7\u00ebshtjet q\u00eb lidhen me:<\/p>\n<ul>\n<li>largimin dhe z\u00ebvend\u00ebsimin e moduleve t\u00eb baterive;<\/li>\n<li>transportin;<\/li>\n<li>riciklimin ose trajtimin tjet\u00ebr;<\/li>\n<li>kostot e <em>decommissioning<\/em>;<\/li>\n<li>p\u00ebrgjegj\u00ebsin\u00eb n\u00eb rast t\u00eb z\u00ebvend\u00ebsimit t\u00eb parakohsh\u00ebm ose <em>recall<\/em>.<\/li>\n<\/ul>\n<p>Nj\u00eb kosto q\u00eb do t\u00eb paraqitet pas dhjet\u00eb ose pes\u00ebmb\u00ebdhjet\u00eb vitesh, megjithat\u00eb, \u00ebsht\u00eb pjes\u00eb e ekonomis\u00eb s\u00eb projektit q\u00eb sot.<\/p>\n<h2>\u00c7far\u00eb po ndodh me BESS n\u00eb rajon?<\/h2>\n<p>Maqedonia nuk \u00ebsht\u00eb nj\u00eb shembull i izoluar. N\u00eb rajon, ruajtja po kalon me shpejt\u00ebsi nga nj\u00eb teknologji plot\u00ebsuese n\u00eb nj\u00eb pjes\u00eb t\u00eb r\u00ebnd\u00ebsishme t\u00eb infrastruktur\u00ebs elektroenergjetike.<\/p>\n<p>Serbia tashm\u00eb e lidh integrimin e burimeve t\u00eb ndryshueshme t\u00eb energjis\u00eb s\u00eb rinovueshme dhe ky\u00e7jen me sigurimin e kapaciteteve balancuese. N\u00eb raste t\u00eb caktuara kur p\u00ebrdoret ruajtja me bateri, rregullativa serbe parashikon s\u00eb paku 0,4 MWh kapacitet ruajtjeje p\u00ebr \u00e7do MW t\u00eb fuqis\u00eb s\u00eb instaluar t\u00eb centralit elektrik, nd\u00ebrsa diapazoni p\u00ebrkat\u00ebs rregullues duhet t\u00eb jet\u00eb s\u00eb paku 20%.<\/p>\n<p>Bullgaria po zbaton nj\u00eb qasje duksh\u00ebm m\u00eb t\u00eb gjer\u00eb n\u00eb nivel sistemi. P\u00ebrmes programit RESTORE, t\u00eb financuar me 603 milion\u00eb euro nga <em>Recovery and Resilience Facility<\/em>, \u00ebsht\u00eb parashikuar infrastruktur\u00eb <em>grid-scale<\/em> me t\u00eb pakt\u00ebn 3.000 MWh kapacitet t\u00eb shfryt\u00ebzuesh\u00ebm p\u00ebr ruajtje.<\/p>\n<p>Greqia, nga ana tjet\u00ebr, tashm\u00eb ka nj\u00eb rrug\u00eb t\u00eb detajuar dhe t\u00eb ve\u00e7ant\u00eb rregullatore p\u00ebr <em>standalone electricity storage stations<\/em>, duke p\u00ebrfshir\u00eb procedurat p\u00ebr <em>Final Connection Offer<\/em> dhe rregulla t\u00eb ve\u00e7anta t\u00eb miratuara gjat\u00eb viteve 2024 dhe 2025.<\/p>\n<p><strong>Prandaj, trendi rajonal \u00ebsht\u00eb mjaft i qart\u00eb: sa m\u00eb shum\u00eb kapacitete diellore dhe me er\u00eb hyjn\u00eb n\u00eb sistem, aq m\u00eb e madhe b\u00ebhet vlera e fleksibilitetit, balancimit dhe ruajtjes.<\/strong><\/p>\n<p><strong>\u00c7far\u00eb duhet t\u00eb kontrolloj\u00eb investitori para se t\u00eb marr\u00eb vendim p\u00ebr BESS?<\/strong><\/p>\n<p>Para marrjes s\u00eb vendimit p\u00ebrfundimtar t\u00eb investimit, analiza juridike dhe komerciale e <em>due diligence<\/em> duhet s\u00eb paku t\u2019u p\u00ebrgjigjet pyetjeve t\u00eb m\u00ebposhtme:<\/p>\n<ol start=\"1\">\n<li>A do t\u00eb jet\u00eb BESS nj\u00eb projekt standalone, pjes\u00eb e nj\u00eb centrali ekzistues apo pjes\u00eb e nj\u00eb centrali t\u00eb ri elektrik?<\/li>\n<li>Kush do t\u00eb jet\u00eb pronari dhe kush do t\u00eb jet\u00eb operatori i sistemit?<\/li>\n<li>A \u00ebsht\u00eb projekti i p\u00ebrfshir\u00eb n\u00eb Planin Vjetor p\u00ebrkat\u00ebs?<\/li>\n<li>Cilat t\u00eb drejta mbi tok\u00ebn nevojiten p\u00ebr baterit\u00eb, n\u00ebnstacionin, kabllot dhe qasjen?<\/li>\n<li>\u00c7far\u00eb akti nd\u00ebrtimor nevojitet p\u00ebr konfigurimin konkret?<\/li>\n<li>A nevojitet autorizim nga Ministria dhe cili \u00ebsht\u00eb regjimi i licencimit?<\/li>\n<li>Sa fuqi importi\/eksporti lejon ky\u00e7ja?<\/li>\n<li>A mund t\u00eb p\u00ebrdoret BESS p\u00ebr modelin e planifikuar t\u00eb tregut dhe balancimit?<\/li>\n<li>A garanton kontrata EPC\/Supply jo vet\u00ebm kapacitetin fillestar, por edhe <em>performance<\/em> gjat\u00eb jet\u00ebgjat\u00ebsis\u00eb s\u00eb projektit?<\/li>\n<li>Kush e mban rrezikun e degradimit, zjarrit, z\u00ebvend\u00ebsimit t\u00eb moduleve dhe defektit teknologjik?<\/li>\n<li>Si jan\u00eb rregulluar O&amp;M, qasja n\u00eb software\/BMS\/EMS dhe disponueshm\u00ebria afatgjat\u00eb e pjes\u00ebve rezerv\u00eb?<\/li>\n<li>Kush i bart kostot dhe detyrimet p\u00ebr <em>decommissioning<\/em>, mbetjet dhe riciklimin?<\/li>\n<li>A jan\u00eb kontratat e projektit t\u00eb pranueshme p\u00ebr nj\u00eb bank\u00eb ose financues tjet\u00ebr?<\/li>\n<\/ol>\n<p>Te nj\u00eb projekt BESS, p\u00ebrgjigjet ndaj k\u00ebtyre pyetjeve shpesh jan\u00eb m\u00eb t\u00eb r\u00ebnd\u00ebsishme se vet\u00eb \u00e7mimi i bateris\u00eb.<\/p>\n<h2><strong>Pyetjet m\u00eb t\u00eb shpeshta p\u00ebr BESS n\u00eb Maqedonin\u00eb e Veriut<\/strong><\/h2>\n<p><strong>A duhet \u00e7do central fotovoltaik t\u00eb ket\u00eb BESS?<\/strong><\/p>\n<p>Ligji p\u00ebr Energjetik\u00eb parashikon detyrim p\u00ebr centralet elektrike q\u00eb p\u00ebrdorin <strong>burim t\u00eb ndryshuesh\u00ebm t\u00eb energjis\u00eb s\u00eb rinovueshme<\/strong>, n\u00eb kuad\u00ebr t\u00eb regjimit t\u00eb nenit 87. Me ndryshimet e korrikut 2026, intervali ligjor i fuqis\u00eb s\u00eb instaluar t\u00eb sistemit t\u00eb ruajtjes \u00ebsht\u00eb nga s\u00eb paku 20% deri n\u00eb m\u00eb s\u00eb shumti 40% t\u00eb fuqis\u00eb s\u00eb centralit elektrik, me kusht p\u00ebr cik\u00ebl ngarkimi dhe shkarkimi prej s\u00eb paku dy or\u00ebsh. Ekzistojn\u00eb edhe p\u00ebrjashtime ligjore. P\u00ebr nj\u00eb projekt konkret duhet t\u00eb kontrollohen statusi i tij dhe regjimi i zbatuesh\u00ebm.<\/p>\n<p><strong>A mund t\u00eb ngarkohet BESS me energji elektrike nga rrjeti?<\/strong><\/p>\n<p>Po. Ligji parashikon shprehimisht se nj\u00eb sistem i integruar i ruajtjes deri n\u00eb 40% t\u00eb fuqis\u00eb s\u00eb centralit elektrik mund t\u00eb ruaj\u00eb edhe energji elektrike t\u00eb marr\u00eb nga rrjeti dhe ta dor\u00ebzoj\u00eb at\u00eb s\u00ebrish n\u00eb rrjet, brenda fuqis\u00eb maksimale t\u00eb nj\u00ebkohshme t\u00eb miratuar t\u00eb ky\u00e7jes.<\/p>\n<p><strong>A mund t\u00eb marr\u00eb pjes\u00eb BESS n\u00eb tregun e energjis\u00eb elektrike?<\/strong><\/p>\n<p>Po. Operatori i sistemit t\u00eb ruajtjes mund t\u00eb blej\u00eb dhe shes\u00eb energji elektrike, t\u00eb ofroj\u00eb sh\u00ebrbime t\u00eb ruajtjes dhe t\u00eb ofroj\u00eb sh\u00ebrbime sistemore, sipas kushteve t\u00eb parashikuara me Ligjin, rregullat e rrjetit dhe rregullat e tregut. P\u00ebr sisteme t\u00eb caktuara t\u00eb ruajtjes me t\u00eb pakt\u00ebn 1 MW fuqi maksimale t\u00eb dor\u00ebzimit parashikohet edhe mund\u00ebsia p\u00ebr pjes\u00ebmarrje n\u00eb mekanizmin e balancimit.<\/p>\n<p><strong>A jan\u00eb MW dhe MWh e nj\u00ebjta gj\u00eb?<\/strong><\/p>\n<p>Jo. MW tregon fuqin\u00eb me t\u00eb cil\u00ebn BESS mund t\u00eb ngarkohet ose shkarkohet, nd\u00ebrsa MWh tregon sasin\u00eb e energjis\u00eb q\u00eb mund t\u00eb ruaj\u00eb. T\u00eb dy parametrat jan\u00eb thelb\u00ebsor\u00eb p\u00ebr struktur\u00ebn juridike, teknike dhe financiare t\u00eb projektit.<\/p>\n<h2>BESS tashm\u00eb \u00ebsht\u00eb \u00e7\u00ebshtje juridike dhe investuese<\/h2>\n<p>Zhvillimi i ruajtjes s\u00eb energjis\u00eb me bateri n\u00eb Maqedonin\u00eb e Veriut po hyn n\u00eb nj\u00eb faz\u00eb t\u00eb re.<\/p>\n<p>Ligji nuk e trajton m\u00eb ruajtjen vet\u00ebm si funksion teknik t\u00eb sistemit elektroenergjetik. BESS mund t\u00eb jet\u00eb objekt energjetik i pavarur, pjes\u00eb e integruar e nj\u00eb centrali elektrik dhe mjet p\u00ebr pjes\u00ebmarrje n\u00eb tregje dhe n\u00eb sh\u00ebrbimet sistemore.<\/p>\n<p>N\u00eb t\u00eb nj\u00ebjt\u00ebn koh\u00eb, detyrimi p\u00ebr ruajtje te burimet e ndryshueshme t\u00eb energjis\u00eb s\u00eb rinovueshme, numri i madh i iniciativave BESS n\u00eb Planin Vjetor dhe kufizimet e rrjetit elektroenergjetik n\u00ebnkuptojn\u00eb se sistemet me bateri do t\u00eb ken\u00eb ndikim gjithnj\u00eb e m\u00eb t\u00eb madh n\u00eb m\u00ebnyr\u00ebn se si zhvillohen projektet e reja diellore dhe ato me er\u00eb.<\/p>\n<p>Prandaj, p\u00ebr investitorin pyetja kryesore nuk \u00ebsht\u00eb vet\u00ebm \u201ccil\u00ebn bateri duhet ta blejm\u00eb?\u201d, por:<\/p>\n<p><strong>Si duhet ta strukturojm\u00eb projektin n\u00eb m\u00ebnyr\u00eb q\u00eb BESS t\u00eb mund ta kryej\u00eb juridikisht, teknikisht dhe komercialisht funksionin p\u00ebr t\u00eb cilin \u00ebsht\u00eb investuar?<\/strong><\/p>\n<p>P\u00ebrgjigjja duhet t\u00eb p\u00ebrcaktohet q\u00eb n\u00eb faz\u00ebn e zhvillimit \u2013 para se t\u00eb fiksohen teknologjia, ky\u00e7ja dhe kontratat kryesore t\u00eb projektit.<\/p>\n<p><em>Sh\u00ebnim: Ky tekst ka karakter t\u00eb p\u00ebrgjithsh\u00ebm informues dhe nuk p\u00ebrb\u00ebn k\u00ebshill\u00eb juridike. Regjimi juridik konkret varet nga struktura, fuqia, lokacioni, ky\u00e7ja dhe statusi i secilit projekt individual. Teksti \u00ebsht\u00eb p\u00ebrdit\u00ebsuar deri m\u00eb 8 shtator 2026<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sistemet BESS (me bateri) n\u00eb Maqedoni Rritja e shpejt\u00eb e prodhimit t\u00eb energjis\u00eb elektrike nga dielli dhe era ka hapur nj\u00eb pyetje t\u00eb re p\u00ebr sistemin elektroenergjetik: si t\u00eb p\u00ebrdoret energjia e prodhuar at\u00ebher\u00eb kur \u00ebsht\u00eb m\u00eb e nevojshme, dhe jo vet\u00ebm at\u00ebher\u00eb kur kushtet atmosferike mund\u00ebsojn\u00eb prodhimin? Pik\u00ebrisht k\u00ebtu sistemet BESS marrin nj\u00eb rol [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":10605,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[488,505,147],"tags":[],"class_list":["post-10592","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investicii-biznis-angeli-fondovi","category-505","category-regulation-in-macedonia"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt | Law Office Aleksov &amp; Memishi<\/title>\n<meta name=\"description\" content=\"\u0411\u0430\u0442\u0435\u0440\u0438\u0438 \u0438 \u0431\u0430\u0442\u0435\u0440\u0438\u0441\u043a\u0438 \u0441\u0438\u0441\u0442\u0435\u043c\u0438 \u0432\u043e \u041c\u0430\u043a\u0435\u0434\u043e\u043d\u0438\u0458\u0430 \u0441\u043f\u043e\u0440\u0435\u0434 \u0417\u0430\u043a\u043e\u043d\u043e\u0442 \u0437\u0430 \u0435\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u043a\u0430 \u0438 \u043d\u043e\u0432\u0438 \u043c\u043e\u0436\u043d\u043e\u0441\u0442\u0438 \u0437\u0430 \u0438\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0438\u0458\u0430\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/\" \/>\n<meta property=\"og:locale\" content=\"sq_AL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt | Law Office Aleksov &amp; Memishi\" \/>\n<meta property=\"og:description\" content=\"\u0411\u0430\u0442\u0435\u0440\u0438\u0438 \u0438 \u0431\u0430\u0442\u0435\u0440\u0438\u0441\u043a\u0438 \u0441\u0438\u0441\u0442\u0435\u043c\u0438 \u0432\u043e \u041c\u0430\u043a\u0435\u0434\u043e\u043d\u0438\u0458\u0430 \u0441\u043f\u043e\u0440\u0435\u0434 \u0417\u0430\u043a\u043e\u043d\u043e\u0442 \u0437\u0430 \u0435\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u043a\u0430 \u0438 \u043d\u043e\u0432\u0438 \u043c\u043e\u0436\u043d\u043e\u0441\u0442\u0438 \u0437\u0430 \u0438\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0438\u0458\u0430\" \/>\n<meta property=\"og:url\" content=\"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/\" \/>\n<meta property=\"og:site_name\" content=\"Law Office Aleksov &amp; Memishi\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/advokataleksov\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-29T12:38:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-29T12:50:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/chatgpt-image-sep-29-2026-02_46_41-pm-1024x472.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"472\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Dejan Aleksov\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dejan Aleksov\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/almelaw.com\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/\"},\"author\":{\"name\":\"Dejan Aleksov\",\"@id\":\"https:\\\/\\\/almelaw.com\\\/#\\\/schema\\\/person\\\/174c26453387bc73e2bd53c33f34a2f4\"},\"headline\":\"Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt\",\"datePublished\":\"2026-09-29T12:38:17+00:00\",\"dateModified\":\"2026-09-29T12:50:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/\"},\"wordCount\":10405,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/almelaw.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/chatgpt-image-sep-29-2026-02_46_41-pm.png\",\"articleSection\":[\"Investimet, engj\u00ebjt e biznesit dhe fondet e QV\",\"\u041e\u0431\u043d\u043e\u0432\u043b\u0438\u0432\u0430 \u0435\u043d\u0435\u0440\u0433\u0438\u0458\u0430\",\"Rregullore n\u00eb MK\"],\"inLanguage\":\"sq-AL\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/almelaw.com\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/\",\"url\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/\",\"name\":\"Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt | Law Office Aleksov &amp; Memishi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/almelaw.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/chatgpt-image-sep-29-2026-02_46_41-pm.png\",\"datePublished\":\"2026-09-29T12:38:17+00:00\",\"dateModified\":\"2026-09-29T12:50:25+00:00\",\"description\":\"\u0411\u0430\u0442\u0435\u0440\u0438\u0438 \u0438 \u0431\u0430\u0442\u0435\u0440\u0438\u0441\u043a\u0438 \u0441\u0438\u0441\u0442\u0435\u043c\u0438 \u0432\u043e \u041c\u0430\u043a\u0435\u0434\u043e\u043d\u0438\u0458\u0430 \u0441\u043f\u043e\u0440\u0435\u0434 \u0417\u0430\u043a\u043e\u043d\u043e\u0442 \u0437\u0430 \u0435\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u043a\u0430 \u0438 \u043d\u043e\u0432\u0438 \u043c\u043e\u0436\u043d\u043e\u0441\u0442\u0438 \u0437\u0430 \u0438\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0438\u0458\u0430\",\"inLanguage\":\"sq-AL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[[\"https:\\\/\\\/almelaw.com\\\/sq\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/\"]]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sq-AL\",\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\\\/#primaryimage\",\"url\":\"https:\\\/\\\/almelaw.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/chatgpt-image-sep-29-2026-02_46_41-pm.png\",\"contentUrl\":\"https:\\\/\\\/almelaw.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/chatgpt-image-sep-29-2026-02_46_41-pm.png\",\"width\":1848,\"height\":851},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/#website\",\"url\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/\",\"name\":\"Law Firm ALME\",\"description\":\"Lawyers for the Digital Age\",\"publisher\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/#organization\"},\"alternateName\":\"almelaw.com\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sq-AL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/#organization\",\"name\":\"Law Office Aleksov & Memishi\",\"alternateName\":\"almelaw.com\",\"url\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sq-AL\",\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/almelaw.com\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/law_office_aleksov_memishi_logo.jpeg\",\"contentUrl\":\"https:\\\/\\\/almelaw.com\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/law_office_aleksov_memishi_logo.jpeg\",\"width\":200,\"height\":200,\"caption\":\"Law Office Aleksov & Memishi\"},\"image\":{\"@id\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/advokataleksov\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/law-office-aleksov-memishi\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/almelaw.com\\\/#\\\/schema\\\/person\\\/174c26453387bc73e2bd53c33f34a2f4\",\"name\":\"Dejan Aleksov\",\"url\":\"https:\\\/\\\/almelaw.com\\\/sq\\\/author\\\/dejan\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt | Law Office Aleksov &amp; Memishi","description":"\u0411\u0430\u0442\u0435\u0440\u0438\u0438 \u0438 \u0431\u0430\u0442\u0435\u0440\u0438\u0441\u043a\u0438 \u0441\u0438\u0441\u0442\u0435\u043c\u0438 \u0432\u043e \u041c\u0430\u043a\u0435\u0434\u043e\u043d\u0438\u0458\u0430 \u0441\u043f\u043e\u0440\u0435\u0434 \u0417\u0430\u043a\u043e\u043d\u043e\u0442 \u0437\u0430 \u0435\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u043a\u0430 \u0438 \u043d\u043e\u0432\u0438 \u043c\u043e\u0436\u043d\u043e\u0441\u0442\u0438 \u0437\u0430 \u0438\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0438\u0458\u0430","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/","og_locale":"sq_AL","og_type":"article","og_title":"Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt | Law Office Aleksov &amp; Memishi","og_description":"\u0411\u0430\u0442\u0435\u0440\u0438\u0438 \u0438 \u0431\u0430\u0442\u0435\u0440\u0438\u0441\u043a\u0438 \u0441\u0438\u0441\u0442\u0435\u043c\u0438 \u0432\u043e \u041c\u0430\u043a\u0435\u0434\u043e\u043d\u0438\u0458\u0430 \u0441\u043f\u043e\u0440\u0435\u0434 \u0417\u0430\u043a\u043e\u043d\u043e\u0442 \u0437\u0430 \u0435\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u043a\u0430 \u0438 \u043d\u043e\u0432\u0438 \u043c\u043e\u0436\u043d\u043e\u0441\u0442\u0438 \u0437\u0430 \u0438\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0438\u0458\u0430","og_url":"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/","og_site_name":"Law Office Aleksov &amp; Memishi","article_publisher":"https:\/\/www.facebook.com\/advokataleksov\/","article_published_time":"2026-09-29T12:38:17+00:00","article_modified_time":"2026-09-29T12:50:25+00:00","og_image":[{"width":1024,"height":472,"url":"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/chatgpt-image-sep-29-2026-02_46_41-pm-1024x472.png","type":"image\/png"}],"author":"Dejan Aleksov","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dejan Aleksov","Est. reading time":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/almelaw.com\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/#article","isPartOf":{"@id":"https:\/\/almelaw.com\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/"},"author":{"name":"Dejan Aleksov","@id":"https:\/\/almelaw.com\/#\/schema\/person\/174c26453387bc73e2bd53c33f34a2f4"},"headline":"Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt","datePublished":"2026-09-29T12:38:17+00:00","dateModified":"2026-09-29T12:50:25+00:00","mainEntityOfPage":{"@id":"https:\/\/almelaw.com\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/"},"wordCount":10405,"commentCount":0,"publisher":{"@id":"https:\/\/almelaw.com\/#organization"},"image":{"@id":"https:\/\/almelaw.com\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/#primaryimage"},"thumbnailUrl":"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/chatgpt-image-sep-29-2026-02_46_41-pm.png","articleSection":["Investimet, engj\u00ebjt e biznesit dhe fondet e QV","\u041e\u0431\u043d\u043e\u0432\u043b\u0438\u0432\u0430 \u0435\u043d\u0435\u0440\u0433\u0438\u0458\u0430","Rregullore n\u00eb MK"],"inLanguage":"sq-AL","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/almelaw.com\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/","url":"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/","name":"Sistemet BESS (me bateri) n\u00eb Maqedoni: korniza juridike, lejet dhe mund\u00ebsit\u00eb p\u00ebr investitor\u00ebt | Law Office Aleksov &amp; Memishi","isPartOf":{"@id":"https:\/\/almelaw.com\/sq\/#website"},"primaryImageOfPage":{"@id":"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/#primaryimage"},"image":{"@id":"https:\/\/almelaw.com\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/#primaryimage"},"thumbnailUrl":"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/chatgpt-image-sep-29-2026-02_46_41-pm.png","datePublished":"2026-09-29T12:38:17+00:00","dateModified":"2026-09-29T12:50:25+00:00","description":"\u0411\u0430\u0442\u0435\u0440\u0438\u0438 \u0438 \u0431\u0430\u0442\u0435\u0440\u0438\u0441\u043a\u0438 \u0441\u0438\u0441\u0442\u0435\u043c\u0438 \u0432\u043e \u041c\u0430\u043a\u0435\u0434\u043e\u043d\u0438\u0458\u0430 \u0441\u043f\u043e\u0440\u0435\u0434 \u0417\u0430\u043a\u043e\u043d\u043e\u0442 \u0437\u0430 \u0435\u043d\u0435\u0440\u0433\u0435\u0442\u0438\u043a\u0430 \u0438 \u043d\u043e\u0432\u0438 \u043c\u043e\u0436\u043d\u043e\u0441\u0442\u0438 \u0437\u0430 \u0438\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0438\u0458\u0430","inLanguage":"sq-AL","potentialAction":[{"@type":"ReadAction","target":[["https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/"]]}]},{"@type":"ImageObject","inLanguage":"sq-AL","@id":"https:\/\/almelaw.com\/sq\/bess-bateriski-sistemi-vo-makedonija-pravna-ramka-dozvoli-i-mozhnosti-za-investitorite\/#primaryimage","url":"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/chatgpt-image-sep-29-2026-02_46_41-pm.png","contentUrl":"https:\/\/almelaw.com\/wp-content\/uploads\/2026\/09\/chatgpt-image-sep-29-2026-02_46_41-pm.png","width":1848,"height":851},{"@type":"WebSite","@id":"https:\/\/almelaw.com\/sq\/#website","url":"https:\/\/almelaw.com\/sq\/","name":"Law Firm ALME","description":"Lawyers for the Digital Age","publisher":{"@id":"https:\/\/almelaw.com\/sq\/#organization"},"alternateName":"almelaw.com","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/almelaw.com\/sq\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sq-AL"},{"@type":"Organization","@id":"https:\/\/almelaw.com\/sq\/#organization","name":"Law Office Aleksov & Memishi","alternateName":"almelaw.com","url":"https:\/\/almelaw.com\/sq\/","logo":{"@type":"ImageObject","inLanguage":"sq-AL","@id":"https:\/\/almelaw.com\/sq\/#\/schema\/logo\/image\/","url":"https:\/\/almelaw.com\/wp-content\/uploads\/2024\/04\/law_office_aleksov_memishi_logo.jpeg","contentUrl":"https:\/\/almelaw.com\/wp-content\/uploads\/2024\/04\/law_office_aleksov_memishi_logo.jpeg","width":200,"height":200,"caption":"Law Office Aleksov & Memishi"},"image":{"@id":"https:\/\/almelaw.com\/sq\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/advokataleksov\/","https:\/\/www.linkedin.com\/company\/law-office-aleksov-memishi\/"]},{"@type":"Person","@id":"https:\/\/almelaw.com\/#\/schema\/person\/174c26453387bc73e2bd53c33f34a2f4","name":"Dejan Aleksov","url":"https:\/\/almelaw.com\/sq\/author\/dejan\/"}]}},"_links":{"self":[{"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/posts\/10592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/comments?post=10592"}],"version-history":[{"count":9,"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/posts\/10592\/revisions"}],"predecessor-version":[{"id":10606,"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/posts\/10592\/revisions\/10606"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/media\/10605"}],"wp:attachment":[{"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/media?parent=10592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/categories?post=10592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/almelaw.com\/sq\/wp-json\/wp\/v2\/tags?post=10592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}